One Technology – Many Applications!
With our solar air technology, a single system allows you to dry a wide variety of materials. You choose the combination that best fits your specific needs!
For example:
- Solar wood chip drying combined with solar hay drying
- Solar wood chip drying combined with solar firewood drying
- Solar wood chip drying combined with solar grain drying
- Solar wood chip drying combined with solar hall heating
- Solar medicinal herb drying combined with solar wood chip drying
- Solar seed drying combined with solar wood chip drying
- … and many more!
Watch the video below to see a combined system for solar firewood and wood chip drying in action.
References
Richter – DE (Schönau-Berzdorf)
- Specifications: 196 m² solar surface area with two flat floors and a Gold control system
- Performance/Output: Dries agricultural products, wood chips, grain
- Year of construction: 2025
Mergenthau – DE (Kissing)
- Specifications: 884 m² solar surface area with three flat floors, two sloped floors, and a Gold control system
- Performance/Output: 180t corn, 600t soy, 800 m² hay, 500t grain, 4,000 m² wood chips
- Dries log wood, hay, grain, corn, soy, wood chips
- Year of construction: 2023
Manzenreiter – Upper Austria (Kirchschlag bei Linz)
- Specifications: 199 m² solar surface area with a flat floor and a Gold control system
- Performance/Output: 300 m³ wood chips, 190 hay bales, 4t grain, 2t broad beans, 100 lcm (loose cubic meters) of firewood
- Dries wood chips, hay, firewood, grain, broad beans
- Year of construction: 2022
Lang – DE (Straßlach-Dingharting)
- Specifications: 184 m² solar surface area with two flat floors, one sloped floor, and a Platin control system incl. storage unit
- Performance/Output: 1,500 m³ wood chips, …
- Dries wood chips, hay, and log wood
- Year of construction: 2021
Pabinger – Styria (Gröbming)
- Specifications: 108 m² solar surface area with a sloped floor
- Performance/Output: Wood chips, hay, and firewood
- Year of construction: 2020
Striegl – Upper Austria (Wartberg)
- Specifications: 144 m² with a flat floor and a Gold control system
- Performance/Output: Around 1,200 lcm (loose cubic meters) of wood chips and additionally hay
- Year of construction: 2024